The SOC 2 bridge letter template, including the version where something changed
The letter management signs for the months after a report period ends, with the paragraphs for the case where something did change.

A SOC 2 bridge letter template gives you the letter management signs for the months between the end of your last report period and today: which report it refers to, that management is not aware of material changes to the system or its controls, any incidents, and a plain statement that the letter is yours and not the auditor’s. It is also called a bridging letter or a gap letter.
The template carries two versions. One is for a quiet gap. The other lists what changed, for the gap that was not quiet, and it is the one worth getting right.
SOC 2 bridging letter template, in full
Every bracketed field is a detail to fill in. The file ends with a table of the fields and what goes in each, so nothing is left as a guess. Section 3 holds the change and incident wording and a worked example for a twelve person software company on AWS.
[Company name]
SOC 2 Bridge Letter
- Also called
- Bridging letter or gap letter
- Written by
- [Company name] management, on company letterhead
- Signed by
- [Signer name], [Signer title]
- Covers
- [Bridge period start] to [Letter date]
1. How to use this template
A bridge letter covers the months between the end of your last SOC 2 report period and today. Management writes it on company letterhead and an officer signs it. The CPA firm that issued the report does not write it and does not sign it, because the firm examined only the period its report covers.
Use the letter in section 2 when nothing material changed during the bridge period. When something did change, keep section 2 and replace its two statements with the wording in section 3, and list each change. A letter that names a change plainly is more useful to a reader than one that claims a clean gap, and it is the only honest version.
Date the letter the day the officer signs it, and write a new one for each request rather than sending an old one. Send it with the report it refers to, never in place of it.
For a Type 1 report, replace "covering the period [Period start] to [Period end]" with "as of [As-of date]", and start the bridge period the day after that date.
2. The letter, when nothing material changed
[Company letterhead]
[Letter date]
To the users of [Company name]'s SOC 2 report
Re: SOC 2 bridge letter for the period [Bridge period start] to [Letter date]
[Company name] received a SOC 2 [Report type] report on its [System name] system, relevant to the trust services criteria for [Categories in scope], covering the period [Period start] to [Period end]. The report was issued by [CPA firm], an independent CPA firm, on [Report issue date].
This letter covers the period from [Bridge period start], the day after that report period ended, to the date of this letter (the bridge period).
Management of [Company name] is not aware of any material change to the [System name] system, to the description of that system in the report, or to the controls described in the report, during the bridge period. To the best of management's knowledge and belief, those controls have continued to operate as described during the bridge period.
Management is not aware of any security incident during the bridge period that resulted in unauthorized access to customer data or that significantly impaired [Company name]'s ability to meet its service commitments.
[Company name] has engaged [CPA firm] for its next SOC 2 examination, covering [Next report period], and expects that report in [Expected report window].
This letter is a statement by the management of [Company name]. It is not a report of [CPA firm] or of any other CPA firm. No examination has been performed for the bridge period, and the letter provides no assurance. It does not extend, update or amend the SOC 2 report, which speaks only for the period it covers. This letter speaks as of its date and is not updated after it is signed.
Questions about this letter can be sent to [Security contact].
[Signer name], [Signer title], [Company name]
Sign-off. Name, signature and date for: Officer signing for management.
3. When something did change
Replace the two statements in section 2 with the paragraphs below, and keep the rest of the letter. State what happened, when, which control it touched and what you did. Do not state that a change had no effect on the controls. Establishing that is examination work, and no examination covers the bridge period.
3.1 The change statement
Management of [Company name] is not aware of any material change to the [System name] system, to the description of that system in the report, or to the controls described in the report, during the bridge period, other than the changes listed below. For each one, the table gives the date, the control it affected, what [Company name] did, and whether the control was operating as described on the date of this letter. Management has not evaluated, and this letter does not state, whether any change affected the achievement of [Company name]'s service commitments and system requirements. That is a matter for the next examination.
| What changed | When | Control affected | What [Company name] did | Operating on the letter date |
|---|---|---|---|---|
| [Describe the change] | [Date or dates] | [Control and criterion] | [What replaced it, or how the lapse was closed] | [Yes, since a date, or no] |
3.2 The incident statement
During the bridge period, [Company name] identified the security incidents listed below. Each was handled under [Company name]'s incident response plan.
| Found | What happened | Customer data affected, and how that was established | Status |
|---|---|---|---|
| [Date] | [One or two sentences] | [What the records show, or that it is still being investigated] | [Open or closed, with the date] |
3.3 Worked example
A twelve person software company on AWS. Its Type 2 period ended March 31 and the letter is signed August 15. Three changes and one incident belong in the letter, written like this:
| What changed | When | Control affected | What the company did | Operating on the letter date |
|---|---|---|---|---|
| The head of engineering, who held the security owner role, left the company | May 12 | Security roles (CC1.3) and the quarterly access review (CC6.2) | The chief technology officer took the role on May 12 and performed the June access review on June 28 | Yes, since May 12 |
| The production database moved from a single instance to a managed cluster in the same region | July 8 | Change management (CC8.1) and backups (CC7.5) | The move went through an approved, peer reviewed change ticket. Backups and point in time recovery were enabled on the new cluster on July 8 and a restore test passed on July 22 | Yes, since July 8 |
| Endpoint protection was not installed on two new laptops for 19 days | June 3 to June 22 | Malware protection on endpoints (CC6.8) | Found by the monthly device report. Agents installed June 22, and onboarding now withholds production access until the agent reports in | Yes, since June 22 |
| Found | What happened | Customer data affected, and how that was established | Status |
|---|---|---|---|
| August 2 | An employee entered their password on a fake sign in page. Multi-factor authentication blocked the sign in. | None. The identity provider sign in log shows no successful sign in from the attacker, and the account reached no production system. | Closed August 3. Password reset and the sender blocked. |
4. What the letter must not say
- That the CPA firm reviewed, approved or stands behind the bridge period. Do not use the firm logo or paraphrase its opinion.
- That the report is extended, renewed or still current for the bridge period.
- That the company is certified. A SOC 2 report is an attestation report with an opinion, and there is no certificate.
- That a change had no effect on the controls, or that customer data was unaffected, without the records that show it.
- A date later than the day the officer signs.
5. Who signs, and how long it holds
An officer with authority to speak for the company who knows how the system runs, for example the chief executive, chief technology officer or chief information security officer. A security engineer signing for the company makes a weaker letter, and the CPA firm never signs it.
The letter has no fixed expiry. It covers the bridge period it states and speaks as of its date. Each reader decides how long a gap they accept, and when the gap grows long the answer is the next report rather than another letter. Keep a running note of anything that would belong in section 3 as it happens, so the next letter takes minutes rather than a reconstruction from memory.
6. Fields to complete
Replace every bracketed field in this document with your own detail, then delete this section.
| Field | What to enter |
|---|---|
| [Company name] | Your legal company name. |
| [System name] | The product or service the report covers. |
| [Period start] | For a Type 2 report, the first day of the period. |
| [Period end] | For a Type 2 report, the last day of the period. |
| [Report issue date] | The day the CPA firm issues the report. |
| [Signer name] | The officer signing for management. |
| [Signer title] | Their title, printed under the name. |
| [Categories in scope] | For example the Security category. |
| [Letter date] | The day the officer signs. The letter speaks as of this date, so never date it ahead. |
| [Bridge period start] | The day after the report period ended, or the day after the as-of date of a Type 1 report. |
| [Report type] | Type 1 or Type 2, as the report states it. |
| [CPA firm] | The firm that issued, or is performing, the examination, named exactly as on its engagement letter or opinion. |
| [Security contact] | The role and email address a reader writes to with questions. |
| [Next report period] | The period the next examination covers, as the engagement letter states it. |
| [Expected report window] | A month or a quarter, written as an expectation. The CPA firm decides when it issues the report. |
Why the company signs it, not the auditor
A SOC 2 examination is an attestation engagement performed under the AICPA attestation standards.1 The CPA firm reports on a stated date or period and on nothing after it. A letter about later months would put the firm’s name on time it never tested. So the letter comes from management, on your letterhead.
The template keeps that boundary in its own paragraph: no assurance, no extension of the report, and a date it speaks as of. How long the report itself stays useful to a reader is covered in how long a SOC 2 report is valid. The AICPA guide practitioners work from treats management’s statements and the auditor’s report as separate documents, and the letter keeps them apart.2 Polara Labs is not a CPA firm. SOC 2 examinations are performed by independent licensed U.S. CPA firms.
Filling it in without overclaiming
- Copy the report details exactly. Type, period, system name, categories and issue date, as the report states them.
- Start the bridge period the day after the period ended. End it on the day the officer signs. Never date the letter ahead.
- Read your own records before choosing a version. The incident log, the change tickets, the access reviews and any departures since the period ended. If any of them shows a material change, use section 3.
- State facts, not conclusions. What changed, when, and what you did. Leave out any claim that it had no effect. A control that lapsed belongs in the letter now, because the next report tests the same months, and how an exception reads in a finished report is less dramatic than a lapse a reader finds on their own.
- Mention the next report only if it is engaged. Delete that sentence if no CPA firm has been engaged for the next period.
The guide to the SOC 2 bridge letter explains what the letter can and cannot assert and how a reader decides how long a gap to accept. Section 2 of the report itself is a different document, the management assertion. Before a first report exists there is nothing to bridge, and the SOC 2 in progress notice is the letter for that stage.
Questions
What is a SOC 2 bridging letter?
Who writes a SOC 2 bridge letter?
Does a bridge letter extend the report?
How long is a bridge letter valid?
What goes in a bridge letter when something changed?
Should a bridge letter mention security incidents?
Sources
Get audit-ready without a compliance team.
The readiness assessment is free, with no payment and no card. Star is $2,000 one time to get on the platform and close your gaps. Orbit is $7,800 a year, and your SOC 2 Type 2 audit is included in every contract year. You can be audit-ready starting at about a week.
Take the free assessmentPolara Labs is not a CPA firm. SOC 2 examinations are performed by independent licensed U.S. CPA firms.